Recommendations: Capacity Allocation Mechanism Network Code Revision
Read full Eurogas assessment here.
Eurogas welcomes the European Commission’s revision of the Network Code on Capacity Allocation Mechanisms (CAM NC). Eurogas particularly welcomes the introduction of new capacity products, more frequent additional auctions, greater transparency on capacity calculation and maximisation, and provisions for Balance-of-the-Month (BoM) capacity tariffs. These improvements can enhance market responsiveness, facilitate capacity optimisation, improve the utilisation of existing infrastructure and enable network users to align transport capacity more closely with their commercial positions.
At the same time, the revised framework should preserve sufficient flexibility for market participants, ensure that new products are available on workable terms, and provide adequate implementation time for TSOs and booking platforms to make those products available. Eurogas therefore calls for further improvements to auction arrangements, including introducing weekly and Balance-of-Week products, and ensuring that interruptible capacity is available for BoM bookings. A clear and proportionate framework for incremental capacity should also be retained, while operational notification periods should be extended to at least one day.
Summary of recommendations
Eurogas recommends that the Commission and relevant authorities:
- Ensure sufficient implementation time for the new monthly and BoM auction arrangements, particularly those scheduled to apply from gas year 2027/28 (for which the auction calendar is expected to be published by January 2027), to allow TSOs and booking platforms to adapt and test their systems. In addition, clear transitional provisions are needed to provide certainty to both TSOs and network users, including the specification of the first auctions to fall under the revised rules.
- Consider introducing weekly and Balance-of-Week products to provide greater flexibility for matching transport capacity with commodity transactions and delivery schedules.
- Retain a clear and predictable incremental capacity process, ensuring that justified capacity needs can be assessed and addressed while streamlining unnecessary procedural requirements.
- Make Balance-of-Month capacity available on an interruptible basis, on top of firm products, allowing users of interruptible capacity to benefit from the new product.
- Maintain a minimum one-day notification period for auction parameters and available capacity, rather than the proposed 12 hours, to ensure adequate operational preparation.
- Clarify the rationale for and expected benefits of applying the new UPA mechanism in additional auctions and explain the rationale and practical implications of the shift from maximum technical to maximum firm capacity.
- Ensure effective NRA enforcement of capacity calculation and maximisation obligations so that increased transparency results in actual capacity availability for the market.