Eurogas welcomes the Commission’s objective to improve capacity availability, market responsiveness and transparency through stronger capacity maximisation, more short-term products and clearer auction design. At the same time, these changes must be accompanied by robust enforcement by National Regulatory Authorities, sufficient product liquidity and realistic implementation timelines to ensure that the benefits translate into actual capacity release and operational certainty for Transmission System Operators and shippers.
- On the extension of the scope of application to interconnection points (IPs) with third countries [Art.2]
- Capacity calculation and maximization [Art.6]
- Allocation Methodology [Art.8]
- Balance-of-Month (BoM) product
- Additional Standard Capacity Products: Weekly and Balance of Week (BoW)
- Additional auctions
- Auction design and flexibility
- Incremental capacity process [Chapter V]
- Modification of auction parameters
- Transitional Timeline